GENMA恭喜兄弟品牌——KOCH大型裝船機(jī)已安全抵達(dá)挪威某鐵礦石碼頭,并順利完成整機(jī)安裝!
這臺裝船機(jī)整機(jī)重量超過2000噸,額定裝載效率高達(dá)每小時11,000噸。面對復(fù)雜的安裝環(huán)境,項目團(tuán)隊采用"整機(jī)運輸+滾裝滾卸+現(xiàn)場頂升安裝基座和行走"的一體化解決方案,協(xié)調(diào)駁船、多軸線、頂升系統(tǒng)及大型吊裝設(shè)備,成功完成了高難度的卸船與安裝任務(wù),實現(xiàn)設(shè)備精準(zhǔn)落軌。
此次里程碑節(jié)點的順利達(dá)成,不僅體現(xiàn)了KOCH在大型港口裝備領(lǐng)域的技術(shù)實力,更彰顯了其承攬和執(zhí)行重大項目的卓越能力。
GENMA congratulates its sister brand KOCH for the safe arrival and complete installation of its large ship loader at the customer's iron ore terminal in Norway!
This equipment weighs over 2,000 tons with a designed loading capacity of 11,000 tons per hour. The project team employed an integrated approach encompassing complete ship loader transportation, roll-on/roll-off loading and unloading, and on-site pedestal and travel gears installation. By utilizing the barge, SPMT, jack-up devices, cranes, and other equipment, the KOCH team successfully overcame the challenging tasks of unloading and installation, ensuring the equipment was smoothly and precisely landed on the rail.
Achieving this project milestone fully demonstrates KOCH's expertise in heavy port equipment and its ability to seamlessly deliver on large-scale projects.
【點分享】
聲明:本文系轉(zhuǎn)載自互聯(lián)網(wǎng),請讀者僅作參考,并自行核實相關(guān)內(nèi)容。若對該稿件內(nèi)容有任何疑問或質(zhì)疑,請立即與鐵甲網(wǎng)聯(lián)系,本網(wǎng)將迅速給您回應(yīng)并做處理,再次感謝您的閱讀與關(guān)注。